Renovating an apartment in Medellín: a guide for foreign owners
Updated November 2026. What you need to know before renovating an apartment in Medellín: your building's rules, what needs a licence, electrical and gas certificates, what whole jobs typically cost, how long they take, IVA, how to pay and how to compare quotes. Written by Medellín Design, a design, renovation and construction company in Medellín led by Gio.
First: is it a refresh or a change of layout?
Almost everything in Colombian renovation rules depends on one question: are you keeping the layout or changing it?
- Same layout: a new kitchen or bathroom where the old one was, new floors, microcement, ceilings, paint, closets, rewiring or replumbing along the same routes. This is treated as repair and upkeep (reparaciones locativas). No licence, only your building's permission.
- New layout or structure: removing or moving walls, opening up a kitchen, changing windows or the façade, enclosing a balcony or terrace, extending. This needs a licence and, in a building, approval from the owners' bodies.
If you're keeping the layout, a renovation here is quicker and simpler than most people expect.
Your building's rules (propiedad horizontal)
Most Medellín apartments sit in buildings run under propiedad horizontal (Law 675 of 2001). Each building has its own rules (the reglamento) and an administrator (administrador). Before any work:
- Written permission from the administration. Ask for it before you sign a contractor. They usually want a description of the work, the dates, the contractor's details and the list of people entering, each with ARL (occupational risk insurance).
- Common areas need more. Anything visible from outside (windows, façade, balcony enclosures) or that touches structure, shared pipes or the roof needs the owners' assembly or council, not just the administrator.
- Working hours. Most buildings allow noisy work on weekdays during the day (often around 8 am to 5 pm) and on Saturday mornings, and none on Sundays and public holidays. Your reglamento sets the exact hours.
- The service elevator. It's usually booked in advance and padded for deliveries and debris.
- Debris (escombros). Bagged, taken down at set times and carried to an authorised disposal site. It can't be left in common areas or on the street.
- A deposit. Some buildings ask for a deposit against damage to common areas, returned at the end.
Permission can take from a few days to a few weeks, depending on whether the council has to meet. Build that into your dates.
What needs a licence and what doesn't
- No licence: kitchens and bathrooms in the same place, floors, microcement and epoxy, ceilings, paint, closets and furniture, rewiring and replumbing in the same layout.
- Licence from a curaduría urbana: moving or removing walls, changing the façade or window openings, extensions, enclosing terraces. Structural changes need an engineer's design under the NSR-10 building code.
- Fincas and country houses (Rionegro, Llanogrande, El Retiro and around): roofs, kiosks, cabins and other new structures need a licence from the municipality, and rural land has extra limits, such as setbacks from water and rules from the regional environmental authority.
A licence adds weeks or months, so check before you settle on a design.
Electrical work and RETIE
Electrical work in Colombia must follow the RETIE, the national technical regulation for electrical installations. In practice:
- Use a qualified electrician with a professional registration, not a general builder.
- New or modified installations are certified as compliant. Depending on the size of the change, that's the electrician's declaration of compliance or an inspection by an accredited inspector.
- Keep the certificate. You'll want it for insurance, a future sale, and peace of mind with a tenant or guest in the apartment.
Gas: certified installers only
Moving or adding a gas point (for a hob, oven or water heater) must be done by a certified gas installer, and the installation is checked by an accredited inspection body. Without that certificate the gas company can refuse or cut the supply. It's one of the few places where there's nothing to negotiate.
What drives the cost
Made-to-measure work has no honest price list: two kitchens the same length can differ by a factor of three. These are the things that move the number most, so you can read any quote you're given.
- Size and layout. Linear metres of cabinets, square metres of floor or wall, and whether anything moves (a sink, a wall, a drain).
- Materials. Board and finish for cabinets (melamine, lacquer, wood veneer), the countertop (quartz, sintered stone, natural stone) and the hardware.
- Demolition and prep. Pouring over existing tile (microcement, epoxy) costs far less than stripping out and rebuilding.
- Plumbing, gas and electrical. Any change needs certified installers and their certificates (RETIE for electrical work).
- Building rules. Some buildings limit work hours, ask for a deposit or need permission for windows that change the façade.
- What's included. Appliances, IVA (19% Colombian VAT), debris removal, building fees and licences are often left out of the headline figure.
We don't publish prices for made-to-measure work. You get 2 or 3 design options after a 20-minute visit, each with one fixed price, installed and guaranteed. The only things we price on the site are our ready-made sofas and installed air conditioning, because those are standard products.
How long it takes
- A custom kitchen: 4 to 5 weeks from the deposit, most of it in the workshop. The time in your apartment is a few days.
- A bathroom: 2 to 4 weeks on site.
- Closets and TV walls: 3 to 4 weeks.
- Microcement: 5 to 8 days. Epoxy floors: 3 to 5 days, plus curing.
- A full apartment: usually 2 to 4 months on site, depending on the scope.
Add the building's permission, plus a licence if you're changing the layout. Imported items (some appliances, fittings or stone) can add weeks if they're held up in customs.
Paying in stages
The usual and safest structure is to pay as the work moves forward, never most of it up front. A common pattern for made-to-measure work:
- a deposit on signing that covers the materials (around half)
- a second payment when the materials are on site and installation starts
- a final payment at handover, after you've checked everything
Pay the company named on the contract, by transfer, against an invoice (factura electrónica). Bigger jobs split into more stages, each tied to progress you can see.
IVA (Colombian VAT)
IVA is 19%. Prices offered to consumers should include it, and a proper quote shows the subtotal, the IVA and the total. Some builders quote construction work on AIU (administration, contingencies and profit), where IVA is charged only on the profit part. Whatever the method, compare the totals with IVA included, and ask for an electronic invoice for every payment. It's your record of what you paid and what was done.
How to compare quotes
Quotes in Medellín vary a lot, mostly because they don't describe the same job. To compare them fairly:
- Same scope. Give every contractor the same list, ideally the same design.
- What's not included. Countertop, hardware, lighting, installation, debris removal, building fees, appliances, IVA.
- Named materials. Moisture-resistant (RH) board or standard board, quartz or sintered stone or granite, the brand of hinges and drawer runners, the brand of taps.
- One fixed price for the whole job, not a running total.
- Dates for the start and the handover, in writing.
- Payment stages tied to progress.
- The guarantee: how long, on what, and who answers for it.
- Certificates for any electrical or gas work.
- Who you call when something needs deciding, in a language you're comfortable in.
Managing it from abroad
Plenty of owners renovate without being here. What makes it work: one person responsible who speaks your language, a design you approve before work starts, the building's permission handled locally, weekly photo or video updates, payments in stages to a company against invoices, and someone trusted to hold the keys. Colombian contracts are written in Spanish, so make sure someone goes through every clause with you before you sign.
How Medellín Design works
Medellín Design is a design, renovation and construction company in Medellín, Colombia, led by Gio. English and Spanish. Kitchens, bathrooms, custom furniture and full renovations, with a design before work starts, a fixed price and a written guarantee.
- Visit. Gio comes, measures and takes photos, about 20 minutes. If you're abroad, he visits with your agent or the building.
- Design and price. 2 or 3 design options on photos of your own space, each with one fixed price for the whole job, presented on a video call.
- Build. Our team and checked Medellín workshops build it. Weekly updates, payment in stages (50% on signing, 40% when installation starts, 10% at handover), and a written guarantee from us.
Read more on how we work, our guarantee and working with an English-speaking contractor in Medellín.
Questions
Do I need a permit to renovate an apartment in Medellín?
What hours can renovation work happen in a Medellín apartment building?
How much does it cost to renovate an apartment in Medellín?
How much does a new kitchen cost in Medellín?
How long does a bathroom renovation take in Medellín?
Do I pay IVA on renovation work in Colombia?
Can I renovate my Medellín apartment while living abroad?
How much should I pay a contractor up front?